Doing battle with a liquidambar.
Going to fully expose all services, wrap in joint foam then encase with minimum 100 cover to bridge between/under the pad footing outside of stairs, and the structural footing on the wall.
Just posting to show I don’t constantly prance about quoting Sylvia Plath and listening to Erik Satie, or fixing broken cars.